Office building refurbishment in Nizza street n°150
Customer: Unicredit Business Integrated Solutions S.c.p.A.
Years: 2011 – 2012 (Lot 1) | 2013 – 2015 (Lot 2) (Built)
Activities: Preliminary Design of entire intervention (Architecture Structural and MEP Engineering), Final Design (Architecture Structural and MEP Engineering) – Lots 1 and 2, Control of worker’s safety on site (HSE) – Lots 1 and 2, Site Supervision – Lots 1 and 2, Quantity Survey – Lots 1 and 2, Fire Engineering
Project cost: Euro 20,0 mln of works | Euro 15,4 mln of works (Lots 1 and 2)