Area 1 and 3: Voltri/Brignole infrastructure upgrading
Area 2: Rugna/Bettolo Park link – Bivio Fegino via Campasso – Bivio Fegino – former Bivio Santa Limbania section
Customer: Consorzio Cociv
Years: 2020 – 2024 (under construction)
Activities: Final design
Project cost: Entire Terzo Valico dei Giovi and Genoa Node project: Euro 7,442 mln
Voltri Brignole upgrading works: 1,333 mln Euro
Rugna/Bettolo Park link: 612 mln Euro
Datas:
- Railway Embankments: 4,000 m of line, standard width of 13 m with reinforced concrete consolidation sections founded on piles
- Polcevera Bridge: length equal to 245 m, width equal to 9.50 m, 3-span bridge over the Polcevera stream with metal truss and foundations on piles and micropiles
- Rossini Bridge: length equal to 53 m, width equal to 11.50 m, single-span metal carpentry bridge over the roadway
- Torbella Bridge: length equal to 33 m, width equal to 12.50 m, single-span bridge over Torbella stream with mixed concrete-steel structure
- Ferri Bridge: length equal to 36 m, width equal to 13.50 m, viaduct over the roadway with a single span made of metal carpentry
- Brignole Artificial Tunnel: length equal to 280 m, width equal to 12 m, height equal to 9.50 m, reinforced concrete structure founded on piles
- Artificial Tunnel Ardoino: length equal to 256 m, width equal to 9 m, height equal to 8 m, reinforced concrete structure
- Number of ancillary works: about 25 works including buildings, wall consolidations, noise barriers, roads etc.