Mitigation interventions hydrogeological works following flood events
Customer: Sogesid S.p.A.
Years: 2020 – ongoing
Activities: Feasibility document of the design alternatives of all interventions, Verification of eligibility and Preliminary design of the chosen scenario
Current activities: Final Design
Project cost: Euro 76.5 mln of works
Datas: Dam on the Rio Giordano: H = 16 m; Reservoir volume = 252,000 m3, Hydraulic branch tunnel: Di = 3,500 mm; L = 1’200 m, New concrete canals with variable section in the urban centre: L = 4 km