Hydrogeological risk

Bitti (Nuoro)

Mitigation interventions hydrogeological works following flood events

Customer: Sogesid S.p.A.

Years: 2020 – ongoing

Activities: Feasibility document of the design alternatives of all interventions, Verification of eligibility and Preliminary design of the chosen scenario
Current activities: Final Design

Project cost: Euro 76.5 mln of works

Datas: Dam on the Rio Giordano: H = 16 m; Reservoir volume = 252,000 m3, Hydraulic branch tunnel: Di = 3,500 mm; L = 1’200 m, New concrete canals with variable section in the urban centre: L = 4 km