Construction works on the DRH building, an innovative university settlement model, a new center for research and higher education
Customer: Polytechnic of Turin
Years: 06/2023-estimated end 06/2025 (in progress)
Activities: Site Supervision, Safety Coordination
Project cost: 23.5 million euros
Architectural project: Masterplan Team – Polytechnic of Turin
The project involves the construction of a parallelepiped volume with a double sleeve and five floors above ground. The Digital Revolution House is proposed as an innovative university settlement model, hosting research and training activities at different levels, in line with the ever-increasing strategy of synergistic collaboration between the various players in technical and scientific research, inside and outside the University.
Within the DRH, in addition to the support facilities common to all users (Atrium, event space, refreshment room, meeting room and garage), the following activities are planned to be established: Team House; Master’s and Higher Education Area; and Research Area.
The intervention involves the demolition of 585 square meters and the construction of 10,295 gross square meters for an increase in S.L.P. of 7,610 square meters.
Upon completion, the research and training center will have a total gross floor area (also considering that of the existing building called the Energy Center) of 20,760 square meters, for a S.L.P. of 13,360 square meters.