Terzo Valico dei Giovi High-Speed/High-Capacity Railway Link – Genoa Node

Genova

Area 1 and 3: Voltri/Brignole infrastructure upgrading
Area 2: Rugna/Bettolo Park link – Bivio Fegino via Campasso – Bivio Fegino – former Bivio Santa Limbania section

Customer: Consorzio Cociv

Years: 2020 – 2024 (under construction)

Activities: Final design

Project cost: Entire Terzo Valico dei Giovi and Genoa Node project: Euro 7,442 mln
Voltri Brignole upgrading works: 1,333 mln Euro
Rugna/Bettolo Park link: 612 mln Euro

Datas:

  • Railway Embankments: 4,000 m of line, standard width of 13 m with reinforced concrete consolidation sections founded on piles
  • Polcevera Bridge: length equal to 245 m, width equal to 9.50 m, 3-span bridge over the Polcevera stream with metal truss and foundations on piles and micropiles
  • Rossini Bridge: length equal to 53 m, width equal to 11.50 m, single-span metal carpentry bridge over the roadway
  • Torbella Bridge: length equal to 33 m, width equal to 12.50 m, single-span bridge over Torbella stream with mixed concrete-steel structure
  • Ferri Bridge: length equal to 36 m, width equal to 13.50 m, viaduct over the roadway with a single span made of metal carpentry
  • Brignole Artificial Tunnel: length equal to 280 m, width equal to 12 m, height equal to 9.50 m, reinforced concrete structure founded on piles
  • Artificial Tunnel Ardoino: length equal to 256 m, width equal to 9 m, height equal to 8 m, reinforced concrete structure
  • Number of ancillary works: about 25 works including buildings, wall consolidations, noise barriers, roads etc.