Terzo Valico Dei Giovi HS/HC Railway Line

Genova (Italy)

On-site use of excavated earth and rocks excluded from waste regulation (art. 24 of Italian Law 120/2017) – Cravasco Niches

Client: COCIV – Consorzio Collegamenti Integrati Veloci – Webuild

Years: 2022-2023

Activities: Environmental Impact Study, Preliminary plan for the on-site use of excavated earth and rocks excluded from waste regulations (National Environmental Impact Assessment Procedure)

Datas: Creation of 5 km of underground niches for the storage of 460,000 m3 of excavated earth and rocks containing above-threshold asbestos

The project involves the construction of underground niches functional for the on-site use of Excavation Lands and Rocks containing asbestos above the threshold, and because of its characteristics, the Environmental Impact Study has been produced for the initiation of the Environmental Impact Assessment (EIA) procedure at the national level.

The work involves the construction of 3 modules of underground niches, for a total development of about 5 km, for the transfer and final storage of Excavation Earth and Rocks containing asbestos for a total volume of 460,000 m3. The studies involve both the Liguria Region and the Piedmont Region in various capacities. All the necessary documents for the start of the EIA procedure have been prepared, as well as the Preliminary Plan for the on-site use of excavated earth and rocks excluded from waste regulations in which all the operational methods for the management of asbestos-containing earth are detailed.