Biorefinery

Crescentino (Vercelli)

first plant in the world for production of 2nd generation bioethanol in the former “Teksid” area

Customer: I.B.P. S.p.A. – Chemtex S.p.A.

Years: 2010 – 2013 (Built)

Activities: Environmental Procedures, Designs and assistance during procedures to obtain building permissions, Preliminary and Final Design (Architecture, Structural and MEP Engineering, Infrastructure), Control of worker’s safety on site (HSE), Site Supervision and Technical assistance to the testing

Project cost: Euro 150.0 mln of works

Datas: 150,000 sqm area

Other projects