Highest automation logistic building of world leader company
Customer: Confidential
Years: 2020 – 2021 (Built)
Activities: Preliminary Design (building, external arrangements) for procurement of works, Complete Detailed Design for subcontracting to suppliers of General Contractor, Energetics, Acoustics, Fire Engineering, Technical assistance to General Contractor during works, BREEAM Consultancy Level achieved: BREEAM EXCELLENT, H&S activity monitoring, Fit-out: H&S planning during Design and Construction Phases, Responsible of Works
Project cost: Euro 98.3 mln of works
Data: 190,000 sqm SUL – 5,100 sqm offices
The building is located near the Novara Ovest tollgate on the A4 Turin-Milan freeway. From a structural point of view, it is made of prefabricated components with cast-in-place pillars with metal carpentry barracades; the roof is made of prefabricated tiles with hollow core slabs.
The new logistics center (186,000 sq. m. total area including more than 5,100 sq. m. for offices, etc.) is a sustainable structure that integrates energy-saving systems while reducing its environmental footprint. In fact, it is equipped with NFPA-compliant sprinkler system and UNI hydrant network, LED lighting system, BMS system and heat pump air conditioning system. Energy produced by photovoltaic panels on the roof power much of the distribution center. Great attention is also paid to the outdoor areas, designed and built to integrate with the existing environmental context with the redevelopment of the adjacent rural and wooded area.
The design was carried out with BIM technology, the building was constructed following the principle of sustainability obtaining BREEAM certification with a rating of “Excellent”.
Courtesy of Engineering 2K S.p.A.